12/31/12 16:02 | 12/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -24 | 46.61 | 0 | -1 | -4 | 12 | D | | | | | | | | | | | | | | |
11/28/12 16:05 | 11/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -18 | 36.39 | 0 | -1 | -4 | 12 | D | | | | | | | | | | | | | | |
11/2/12 16:03 | 10/31/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -19 | 36.57 | 0 | -1 | -4 | 12 | D | | | | | | | | | | | | | | |
9/28/12 16:03 | 9/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -19 | 37.70 | 0 | -1 | -4 | 12 | D | | | | | | | | | | | | | | |
8/28/12 16:05 | 8/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -18 | 36.00 | 0 | -1 | -4 | 12 | D | | | | | | | | | | | | | | |
7/30/12 16:06 | 7/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -18 | 35.82 | 0 | -1 | -4 | 12 | D | | | | | | | | | | | | | | |
6/28/12 16:06 | 6/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -17 | 34.27 | 0 | -1 | -4 | 12 | D | | | | | | | | | | | | | | |
5/30/12 16:04 | 5/25/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -204 | 35.32 | 0 | -6 | -33 | 12 | D | | | | | | | | | | | | | | |
4/30/12 16:06 | 4/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -220 | 38.07 | 0 | -6 | -33 | 12 | D | | | | | | | | | | | | | | |
3/28/12 16:04 | 3/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -214 | 37.03 | 0 | -6 | -33 | 12 | D | | | | | | | | | | | | | | |
2/29/12 16:31 | 2/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -197 | 34.14 | 10 | -6 | -38 | 9 | D | 59 | -14 | -2 | -6 | -7 | 0 | -4 | -5 | 2 | -1 | | | | |
1/31/12 16:04 | 1/27/12 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -210 | 36.32 | 6 | -6 | -38 | 9 | D | 48 | -9 | -6 | -11 | 5 | 4 | -1 | -1 | -4 | -4 | -6 | | | |
12/28/11 16:03 | 12/27/11 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S.d | -204 | 35.25 | 6 | -6 | -38 | 9 | D | 48 | -15 | -12 | -5 | -13 | -7 | 2 | 0 | 1 | 7 | 7 | | | |
8/16/11 16:19 | 8/12/11 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S | -6 | 34.83 | 8 | 0 | -2 | 9 | D | 128 | 42 | -19 | -15 | -14 | -15 | -4 | 9 | -1 | -8 | 5 | 20 | 8 | |
5/10/11 16:04 | 5/6/11 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S | -19 | 39.91 | 6 | 0 | -5 | 9 | D | 107 | 33 | 54 | -5 | 8 | 16 | 9 | 7 | -3 | -2 | -12 | -22 | 0 | |
2/24/11 16:33 | 2/22/11 | ARB | Arbitron Inc | DE | BizSv | EngSv | Engineering, Accounting, Rese | Smith Steven Michael | MD | O | EVP,Surv | S | -21 | 43.02 | 7 | 0 | -8 | 6 | D | 206 | 83 | 66 | 41 | -5 | -10 | -10 | -9 | 1 | -1 | -4 | 3 | -15 | -9 |